Cincinnati — The urban development team submitted a 130-page final proposal this week to redesign The Banks, focusing on five under-used downtown parcels and proposing 2.5 million gross square feet of new buildings plus 1.5 million gross square feet for residential, hotel, retail and office uses, with an estimated cost of $770 million to $800 million. The City of Cincinnati and Hamilton County will review the plan, and the City Planning Commission is the next decision point after an 11-month consultant collaboration involving Perkins & Will, MKSK Studios, Kolar Design, Nelson Nygaard and HR&A Advisors; the update emphasizes enhanced public spaces and improved riverfront connections. Separately in Iowa City on Wednesday, senior Tavion Banks declared for the NBA Draft and said he will enter the transfer portal if a fifth year of eligibility is not granted, with the portal closing April 21 and the draft scheduled for June 23–24.
Prepared by Christopher Adams and reviewed by editorial team.
قد يعيد هذا التطوير تشكيل وسط مدينة سينسيناتي، مما قد يعزز قيمة العقارات والأعمال التجارية المحلية. وقد يعني ذلك أيضًا المزيد من الوظائف أثناء البناء وفي المباني الجديدة. ترقبوا قرار لجنة تخطيط المدينة.
إعادة تطوير البنوك مشروع ضخم بتكلفة باهظة. ويهدف إلى تنشيط المناطق غير المستغلة وتحسين الأماكن العامة. إذا كنت من سكان سينسيناتي، فقد يؤثر ذلك بشكل كبير على منظر مدينتك. يستحق إعادة الإرسال إذا كنت تعرف شخصًا يعيش في سينسيناتي.
قد يحصل المطورون المحليون وشركات الضيافة ومستثمرو العقارات على فرص تجارية وإيرادات إذا تم تنفيذ إعادة التطوير كما هو مقترح.
يواجه السكان والشركات الصغيرة خطر التهجير، وتعطيل الإنشاءات، وارتفاع محتمل في التكاليف دون تدابير تخفيف.
No left-leaning sources found for this story.
فريق التطوير يقدم خطة بقيمة 800 مليون دولار لإعادة تصميم "The Banks"
FOX19 WXIX TV WKEF Times-RepublicanNo right-leaning sources found for this story.
Comments